Segments 1 & 2 (comments)
· Downtown to S. Forbes. Begin at
Thoroughbred Park and acknowledge water-not necessarily on actual path.
Nodes; fountains, watering troughs.
· Parking structure on both sides of viaduct
accessed from viaduct? Ramp?
· Formal first section; Founders Square/
“Gaslight” district.
· Green node at intersection of Newtown
extended.
· New development
· Possible restaurants and shops on North
side.
· New hotel
· Rework transformer, connect Woodward
Heights Park.
· Recommend redevelop existing rail yards
as residential.
· Existing abandoned RR alignment as trail
along creek.
· Creek crossing of old RR bed as opportunity.
· Tunnel under RR possibility
· Widen Manchester under RR
· Widen where cross creek near existing
RR
· Extend gaslight commercial on south
side of creek beyond new intersection with Newtown.
· Link across railyard/Buchanan to cemetery.
· Fingers of open space through new residential
to older neighborhood. Redev. Lexington mechanical, also S. Manchester
St. as residential.
· Old Southern States bldg. at Versailles/Newtown.
Residential or Farmer’s Market.
· RR crossing to Forbes Rd.
· Possible link to Calvary, but Buchanan
more logical.
· Cross Rd before viaduct, connect w/
Pyramid.
· Tunnel under to connect to Speigle Park.
· Backside of active RR to the get back
to creek, cont. along creek.
· Conflict at Forbes as well.
· Re: dev. along creek. Office/mixed
use.
· Pepper Dist as loft, artist office,
Restaurants, live/work.
· Quarry: older section-higher, potential
park, and 40’ above creek.
· McConnell connection along Short line. |