Building the StorageTek Silos 12/4/96 - 12/5/96
What are these?
Day 1
Boxes everywhere!
Floor Sections...1 assembled
Inside walls and tape slots
Top of one silo
Some of the tape drives (back)
Some of the tape drives (front inside)
Floor Sections...1 assembled
One of the robotic arms in place
One of the robotic arms in place with a wall panel
More walls, and the LCU
A bit more
And a bit more
One outside complete!
The top is about done
Looking things over
The other robotic arm in place
Lots of help with the arm
In goes a motor
An inside look
Another inside view
Both ouside shells complete
Both ouside shells complete (2nd view)
Lots of tape slots
Day 2
Some cableing
Tape drives being attached
Hanging the inner upper wall sections
Between the inner and outer walls
2 of 4 tape grabbers (Remember the movie "Short Circuit"?)
Inner upper walls complete
Day 3
Both silos have their doors
21 slot CAP door
81 slot CAP door and PCAP door
Attaching to the ESCON channel on our 9672
The last of the tape drives, an M32
M32 preparation
M32 install 1
M32 install 2
M32 install 3
Grabber assembly hanging out with the SE
The grabbers
Robot looking for something to do
Robot with his headlights on
Matt and Shashi take a look around
The SILO command center
What?
What one of the SILOs is replacing. Metrum 600 tape robot
What are these?
Last updated 09 December 1996.