Bid Pack 5 Core and Shell

Project Description: The construction of the new 1,022,000 gross square feet building's structural frame, fireproofing, exterior wall enclosure for all new building spaces, windows, exterior doors and roofs.Also included will be all exterior site improvements, civil design for roadways, drainage systems, landscaping, hardscape surfaces and walks.

 

 

UK Project Manager: Bob Williams rswill@email.uky.edu
Consultants: GBBN / AM Kinney
Contractor:Turner
Construction Start: 06/16/08

Project Status: The erection of the pedestrian bridge was completed on October 10th.Approximately 3,000 tons of steel have been installed to date.Installation of the structural steel continues.Installation of the metal deck is complete up to the 11th level on the West and East towers.The structure for the East connector is complete.Concrete has been placed up to the 9th floors on the West Tower and up to the 8th floor on the East Tower.Concrete was also placed on the East connector floors as well as the 1st floor outdoor terrace.Approximately 4,800 cubic yards of concrete have been placed to date.The masonry work continued this month.Installation of the podium-precast panels has been completed with the final detailing now being competed on the East side.Installation of the Tower precast panels has started on the West tower.These panels are being installed on second shift to maximize the use of the tower crane equipment.The sealant contractor continues to work on the South and North elevations of the Podium following the precast installation around the project.The curtain wall contractor continues to work on window installations on the Podium West, North elevations and West side of the east connector curtain wall.Currently, 90% of the west elevation is completed.The elevator contractor is currently working on rails and platforms for elevators 02 and 06; the work on elevator 07 began in early October.The mechanical work is continues in the basement with most major system components installed and connected.Testing of the steam, temporary gas, condensate and clean steam have completed to the third floor isolation valves.Approximately 50% of the pipe rack piping is onsite and currently in the process of rack installation.The BP 5 electrical work continues with installation of temporary power and lighting.Installation of conduit continues on the third and fourth levels.The electrical switchgear is in place and conduits are being run to tie into these units.The third level conduit runs are nearing completion with tie-ins (piping only) being completed to the risers in the coming weeks.The fourth floor is now the focus of this bid package.HVAC mechanical ductwork progressed on the third/fourth level.Installation of duct continues to progress following the plumbing piping and is moving towards the east plenum casing.The plumbing piping for the towers above the ductwork is complete, and this work is dropping back to pickup lower level piping and venting.

University of Kentucky
Capital Project Management Division
Room 222 Peterson Service Building
Lexington, KY 40506-0005
(859) 257-5911 Fax (859) 323-1017

Last update: 11/17/09

An Equal Opportunity University | email to: cpmdpagemaster

 

Location: 1000 South Limestone (Click here for link)
Source of Funds:Agency Funds and Bonds
Completion: 02/21/11

 

 

 