Project Description: The interior fit-out partitions, interior finishes, doors and frames, ceilings, mechanical systems, electrical systems, technology systems, medical equipment and fire protection for approximately 490,000 occupiable square feet; and 532,000 square feet of shell space.The work also will include drawings and specifications for signage, interior furnishings and lighting.
|
|
| UK Project Manager: Bob Williams rswill@email.uky.edu | |
| Consultants: Turner and Boyken International | |
| Contractor: Turner Construction | |
| Construction Start:12/16/08 | |
Project Status:The contract was extended 15 days due to a Mechanical Coordination Issue on the Ground Floor ED areas.Bid package 6 work has started on the seventh level this month. The interior trades continue to work through the ground floor west to east.Contractors have begun work in area C on the ground level this month to include the health care support center.Swisslog has been installing the pneumatic tube system on the ground level this month.They will move back to the existing hospital areas to install during November.The medical light and boom supports on the ground level have been completed. The medical light and boom supports have been completed on the sixth level and were installed on level seven.Operable wall supports and overhead door supports were also installed.The acoustical contractor is 95% complete with the framing of the walls on the ground level.Drywall hanging continues in med gas zones 2 and 3 on the ground level.Framing and top out continues on the second level this month in conjunction with duct installation.The painting contractor continues priming the ground level.Installation and testing of sprinkler bulk mains completed in the basement.Sprinkler pipe installation began on the 3rd and 4th levels; pipe installation has begun on the ground floor beginning with med gas zone #1 and progressing into zone #2.Installation of HVAC duct mains and distribution continued on the ground floor with the basement being substantially complete at this time, pending installation of ceilings and accessories in shelled space.Insulation of this duct continues on the ground floor in zones 1, 2, and 3.Installation of storm piping is substantially complete, although wrap up work continues under the fifth level deck.Sanitary waste and vent piping continued on the ground and basement levels.Potable water piping continued at the ground and basement levels.Installation of electrical conduit continued in the basement and ground level.Installation of cable tray began at the ground level.Wire pulling began in the basement. University of Kentucky Last update: 11/17/09 |
|
| Location:1000 South Limestone (Click here for link) | |
| Source of Funds: Agency Funds and Bonds | |
| Completion: 02/21/11 | |
|
|