UK Design Standards

00    Standards and Guidelines

  0    Bidding and Contracts

  1    General Requirements

  2    Site Work

  3    Concrete

  4    Masonry

  5    Metal

  6    Wood and Plastics

  7    Thermal and Moisture Protection

  8    Doors and Windows

  9    Finishes

10    Specialties

11    Equipment

12    Furnishings

13    Special Construction

14    Conveying Systems

15    Mechanical

16    Electrical

17    Communications

 

Email comments to: FacilitiesInfoRequests@uky.edu

 

Top of Page

  CSI # CSI Title Applies to: Dated: Downloads:
           
00100B01   Instructions to Bidders All Projects 04/10 .pdf .doc
00100B02 MBE WBE Participation Goals All Projects 04/10 .pdf .doc
00110B01 Architectural Office & Drafting Supplies. and Equipment
       
00120B01 Filing Systems
       
00160B01 CAD Systems
       
00175B01 Software
       
00200B01 Information available to Bidders
       
00300B01 Bid Forms
       
00300B02  Form of Proposal All Projects 6/98 .pdf .doc
00340B01 Building & Management Consultants
       
00400B00 SUPPLEMENTS TO BID FORMS
       
00410B01 Architectural Scale Models
       
00440B01 Delivery & Pickup Service
       
00450B01 Reprographic Services & Equipment
       
00500B01  Contract agreement Form
All Projects 6/98 .pdf .doc
00500B02  Affidavit All Projects 6/98 .pdf .doc
00502B01  Determination of Responsibility
All Projects 6/98 .pdf .doc
00503B01  Memorandum to Bid File All Projects 6/98 .pdf .doc
00600B00 BONDS AND CERTIFICATES
       
00601B01  Payment Bond General Contractor All Projects 2/09 .pdf .doc
00601B01  Payment Bond CM at Risk All Projects 2/09 .pdf .doc
00601B01  Performance Bond General Contractor All Projects 2/09 .pdf .doc
00601B01  Performance Bond CM at Risk All Projects 2/09 .pdf .doc
00601B01  Bid Bond General Contractor All Projects 2/09 .pdf .doc
00601B01  Bid Bond CM at Risk All Projects 2/09 .pdf .doc
00602B01  Plumbing Inspection and Water Sample Report
All Projects 6/98 .pdf .doc
00602B02  Electrical Inspection and PM
All Projects 7/01 .pdf .doc
00602B03  Air Systems Testing, adjusting and Balancing
All Projects 7/01 .pdf .doc
00602B04  Fume Hood Inspection MedCen/Hosp only 3/97 .pdf .doc
00700B00  General Conditions of the Contract for Construction by a General Contractor All Projects 8/13 .pdf .doc
00700B00  General Conditions of the Contract for Construction by a Construction Manager at Risk All Projects 7/13 .pdf .doc
00700B01 Design Criteria Standards & Codes Main Campus only 6/06 .pdf .doc
00700B02  Consultant Contract Responsibilities All Projects 7/01 .pdf .doc
00700B03 Custodial Closet Space Main Campus only 6/06 .pdf .doc
00710B01   Training All Projects

7/01

.pdf .doc
00710B02   Punch List Responsibility All Projects 7/01 .pdf .doc
00900B01 Addenda        
00960B01 Interior Design Consultants        

Site designed for I.E. 6.0 free download here      Last update: 03/24/11

An Equal Opportunity University | email to: cpmdpagemaster