CS-499 Activity Log for: Maiya |
Week |
Hours
Worked |
Tasks
Performed |
9/13 |
3
hours |
Designed
and Developed the website and Project Logo. |
9/20 |
15
mins |
Discussed
with Paula about the SCH Project Emailed the team members to set
up a time to meet with Mr.Sneed. |
9/27 |
4
hours |
Emailed
Mr. Sneed to set an appointment to meet the team members. Met
with Mr.Sneed to discuss the requirements and what he expects
from the system. We spent 3 hours at the library to discuss the
whole layout of the project and to develop a presentation for
the assignment. |
10/4 |
1
hours |
I
developed the SCH Emplyee's Login page and a test database for the
admin. Used ASP to develop all the web interfaces. |
10/11 |
1
hours |
Developed
the add conference function with the releative test database |
10/15 |
3
hours |
Developed
the following functions with the relative databases, Delete conference. |
10/16 |
3
hours |
Adding/Deleting
a SCH employee to/from the system. Developing with ASP code and
Access DB. Web interface for the this function. |
10/17 |
4
hours |
Designed
and developed the client side web interface with the Request reservation
function along with the test database. |
10/18 |
1
Hour |
Fixing
some bugs in the Client side request forms. |
10/20 |
2
hours |
Group
meeting at the Engineering library. Also updated the website with
Lim's information. |
10/22 |
2
hours |
Group
meeting at the Engineering Library - discussed about the presentation
and allocated tasks to each member. I taught the team members some
basics about ASP and how to develop a simple form on html. Also
showed the team how to operate dreamweaver. |
10/23 |
3
hours |
Modified
the implemented pages according to the standard Database made by
Paula. Added modifications to the Add /Delete conference. Made modification
to the login page of the SCH scheduler, whith different access levels
to each user/employee. Added the data dictionary sent by Lim to
the team website. |
10/25 |
4
Hours |
Implemented
adding buildings and updating from/to the system, prioratizing filling
each building, modifications to deleting a conference and modifications
to employee access levels. |
11/9 |
20
mins |
Met
with Dr.Baxter in class to discuss about the room allocation queries. |
11/14 |
2
hours |
Worked
on the client's end of the project. Re-designed the webpage with
new links for login, driving directions. Developed the client request
page. |
11/15 |
1
hour |
Met
with Paula at the CSlab to teach her some ASP which she was working
on. |
11/25 |
5 hours |
Developed
the client's login page, and the rest of the Request page. |
11/26 |
6
Hours |
Development
of room assignments. Re-designed the database as some of the fields
in the database was redundant. Eliminated some of the tables and
added more fields for client table. |
11/27 |
7
hours |
Development
of the room assignments page. |
11/28 |
6
hours |
Development
of clients' updating their information with user ID and password,
Allocating rooms from SCH employee's side and sending emails. |
12/3 |
1
hour |
Uploading
the files to HAWKWEED.CS.UKY iis server and integration testing. |
12/4 |
5
hours |
Print
functions and testing other bugs in the program. |
12/13 |
|
|
Total
|
|
|