• Skip To Content
People Map
UK site logo
  • myUK
  • << Facilities Main
  • Mission Statement
  • Project List
  • Official Design Standards
    • All available standards
    • Division 00 - Procurement and Contracting Requirements
    • Division 01 - General Requirements
    • Divisions 02 - 19 - Facility Construction
    • Divisions 20 - 29 - Facility Services
    • Divisions 30 - 39 - Site and Infrastructure
    • Divisions 40 - 49 - Process Equipment
    • Updated within last 12 months
    • Updated within last 6 months
  • Live Project Cameras
  • University Architect
  • Interior Design
    • Services
    • Projects
    • Contacts
  • UK Campus Planning
  • Staff Directory
  • Directions to Office
  • Frequently Asked Questions
Capital Project Management Division
Home / Divisions 20 - 29 - Facility Services Subgroup / 230000 - Heating, Ventilating and Air Conditioning (HVAC)

230000 - Heating, Ventilating and Air Conditioning (HVAC)

233346S01 Flexible Duct

  • Read more about 233346S01 Flexible Duct

230620S03 Underground and Direct Buried Steam and Condensate Piping

  • Read more about 230620S03 Underground and Direct Buried Steam and Condensate Piping

232200D03 Steam & Condensate Piping & Pumps, Steam Collection Leg

  • Read more about 232200D03 Steam & Condensate Piping & Pumps, Steam Collection Leg

233600S03 Terminal Device Coil Assembly

  • Read more about 233600S03 Terminal Device Coil Assembly

230500 Common Work Results for HVAC, Refrigerant Management

  • Read more about 230500 Common Work Results for HVAC, Refrigerant Management

233816S01 Fume Hoods

  • Read more about 233816S01 Fume Hoods

230900S03 Instrumentation and Controls for HVAC, 12/2019

  • Read more about 230900S03 Instrumentation and Controls for HVAC, 12/2019

233700S01 HVAC Air Outlet and Inlets

  • Read more about 233700S01 HVAC Air Outlet and Inlets

236000S02 BUILDING AND PLANT CHILLED WATER METERING

Supercedes Ameresco Standards 262713S10 and 262713S11.

Allows for BACnet IP or MSTP communications.

  • Read more about 236000S02 BUILDING AND PLANT CHILLED WATER METERING

236000D03 CENTRAL COOLING EQUIPMENT – Chilled Water Meter Detail

  • Read more about 236000D03 CENTRAL COOLING EQUIPMENT – Chilled Water Meter Detail

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • next ›
  • last »
  • << Facilities Main
  • Mission Statement
  • Project List
  • Official Design Standards
    • All available standards
    • Division 00 - Procurement and Contracting Requirements
    • Division 01 - General Requirements
    • Divisions 02 - 19 - Facility Construction
    • Divisions 20 - 29 - Facility Services
    • Divisions 30 - 39 - Site and Infrastructure
    • Divisions 40 - 49 - Process Equipment
    • Updated within last 12 months
    • Updated within last 6 months
  • Live Project Cameras
  • University Architect
  • Interior Design
    • Services
    • Projects
    • Contacts
  • UK Campus Planning
  • Staff Directory
  • Directions to Office
  • Frequently Asked Questions

Doing Business with UK

  • Request for Professional Consulting (Architects & Engineers)
  • New Housing Development
  • Advertisements for Bids & RFP's
  • Supplier Diversity
  • UK Brand Standards

UK Links

  • UK Home
  • Facilities Management
  • Master Plan: Update 2013
  • Construction Map
  • Sustainability Task Force
  • Purchasing
  • Facilities Utility Outage Request Form
  • Transportation Master Plan
  • Infrastructure Master Plan

University of Kentucky
Capital Project Management Division
Room 222 Peterson Service Building
Lexington, KY 40506-0005
(859) 257-5911 Fax (859) 323-1017

  • An Equal Opportunity University
  • Accreditation
  • Directory
  • Email
  • Privacy Policy
  • Accessibility
  • Login
  • University of Kentucky
  • Lexington, Kentucky 40506